Step 4. Prepare the tools: hacksaw or grinder, hammer, level, tape measure, screwdriver, marker.
Necessary tool
Screwdrivers
Stage 5. If the building is old and the walls are cayman islands mobile database particularly strong, they should be reinforced with reinforcement and plastering beforehand. We level the walls.
Preparing the walls
Stage 6. In old buildings or with low load-bearing capacity, it is necessary to choose lighter slabs with insulation and clinker tiles.
Advice! It is important that the design and decor are to your taste, so decide right away which tile to choose.
Step 7. Measure the wall areas and calculate the number of panels, taking into account the size of each of them.
Step 8. For the base, use more reliable types - metal with decorative plaster, or pressed cement and wood or brick decor (there are many options), also made of metal.
An example of the design of a façade plinth
Stage 9. The base should be additionally treated with sealants, taking into account the humidity and quality of the soil, as well as the proximity of groundwater to the foundation.
Prices for popular models of screwdrivers
-
- Posts: 742
- Joined: Sat Dec 21, 2024 3:34 am