Mark the location of the pile structure using pegs and a level gauge;

Post by zihadhosenjm40 »

Cover metal pipes with an anti-corrosion compound, use only new pipes;
Make small recesses for future supports of the frame foundation;
Now it's time to screw the metal piles into the ground, this is done in a clockwise circular motion with a little pressure. When performing such work, it is necessary to strictly control the verticality of the structure;
The piles are driven in until the structure reaches cambodia mobile database that is no longer frozen;
After screwing in all the piles, you need to align the upper edges with one horizontal level. For this, use levels, a grinder or a sander;
Concrete is poured into the pile structure, which creates additional rigidity of the structure and increases the strength of the foundation;
To create a horizontal plane, metal plates are welded to the upper edge of the piles, onto which concrete slabs are placed.
How to make a connection of components with your own hands
The mounted supports now need to be connected with metal components, on which the timber and corner frame will then be laid. For this, a grillage made of concrete or natural wood is used. If a frame is used, then the corners of the foundation need to be additionally reinforced. For baths, it is recommended to use a raised grillage, which must be installed directly on the ground and not dug into the soil.

The construction of such a foundation is practically no different from the classic concrete one, it is just the depth of the foundation that is different. Then the supporting structure of the walls made of timber or logs is laid on it. The order of making the foundation for baths:

The top layer of soil is removed strictly to the thickness of the future foundation. Sand and crushed stone are poured into the resulting trench. This creates a reliable shock-absorbing cushion.
Now you need to make the formwork. It is made from timber or boards by knocking together individual panels. The structure is made as strong as possible to withstand the weight of the concrete.
Then the reinforcement of the inner part of the foundation is done. Reinforcement is made from metal rods or wire, the connection is made by welding.
Now you can fill the trench with concrete. It is recommended to fill it evenly over the entire area of ​​the foundation.
In some cases, a concrete grillage is not made. To reduce the cost of the building structure, wooden beams can be installed directly on the metal supports. And the frame can be securely reinforced with nails or wire.