Next, you need to install the floor planks.
Posted: Thu Feb 06, 2025 5:30 am
The block may have depressions from the studs. Use them to drill holes of the required diameter. The block can also be positioned using a tape measure, but it is easy to make a mistake.
If part of the wall remains outside, then it will need to be covered with decorative masonry in the future.
The wall should be covered with waterproofing in rolls. If you plan to use roofing felt, it should be laid in 2 layers.
Construction of the frame
The frame of a mansard roof consists of floor beams, rafters, purlins and posts.
Coniferous timber beams 200x100 mm are often used as the material. The floor slats are laid on top of the mauerlat with an indentation of 30–50 cm beyond the wall surface or in prepared grooves in colombia mobile database masonry. In the first case, the parts are fixed using corners and self-tapping screws.
The timber can be fixed to the wall plate using steel corners.
To create a level ceiling, the planks should be installed in the following sequence:
First, the outer parts are laid out according to the level.
Next, you need to stretch the cord and install the intermediate elements along it.
The beam pitch should be from 60 to 100 cm. A distance of 60 cm makes it possible to install insulation boards without cutting.
To level the beams by height, they can be trimmed. Another option is to use slat spacers.
If the beams are inserted into prepared pockets, their outer parts must be treated with liquid waterproofing and wrapped with roofing felt.
The following racks must be placed on the outer planks:
If part of the wall remains outside, then it will need to be covered with decorative masonry in the future.
The wall should be covered with waterproofing in rolls. If you plan to use roofing felt, it should be laid in 2 layers.
Construction of the frame
The frame of a mansard roof consists of floor beams, rafters, purlins and posts.
Coniferous timber beams 200x100 mm are often used as the material. The floor slats are laid on top of the mauerlat with an indentation of 30–50 cm beyond the wall surface or in prepared grooves in colombia mobile database masonry. In the first case, the parts are fixed using corners and self-tapping screws.
The timber can be fixed to the wall plate using steel corners.
To create a level ceiling, the planks should be installed in the following sequence:
First, the outer parts are laid out according to the level.
Next, you need to stretch the cord and install the intermediate elements along it.
The beam pitch should be from 60 to 100 cm. A distance of 60 cm makes it possible to install insulation boards without cutting.
To level the beams by height, they can be trimmed. Another option is to use slat spacers.
If the beams are inserted into prepared pockets, their outer parts must be treated with liquid waterproofing and wrapped with roofing felt.
The following racks must be placed on the outer planks: