To do this, the bowl should be turned on its side and the drain hole for the siphon should be equipped with rubber seals that prevent water leakage. In order not to have to "turn" the container again soon, it is better to immediately take care of a high-quality reliable siphon. The sewer pipe with a drain must be located below the outlet pipe of the siphon.
The bathtub is installed horizontally without a cambodia mobile database on the prepared surface using a level placed on the bottom. But the outer edge is literally half a centimeter higher than the inner one (so that water does not spill over the edge onto the floor).
Correct installation of a cast iron bathtub on bricks involves connecting the drain to the sewer hose in two ways: a strong and more reliable rigid connection: a plastic pipe and a knee with an angle of 45° and 90° are used; a flexible and movable compensation plastic corrugation is connected hermetically using a sealant to the sewer inlet.
It is necessary to ensure free supply of hot and cold water supply pipes, drainage systems. It is important to immediately make sure that the installation is correct. To do this, fill the container with water and open the drain. If the liquid does not drain immediately, with delays, then there is a skew.
One more nuance. Before installing the bathtub, calculate the distance from its rear end to the wall. If there is supposed to be excess space, it should also be bricked up. Alternatively, a support box under the bowl, just below the edge.
The final "touch" is to cover the brick base with ceramic tiles or install a screen. A working opening must be left for possible access to the siphon.
A siphon with an overflow is mounted on a bathtub that has not yet been installed.
-
- Posts: 742
- Joined: Sat Dec 21, 2024 3:34 am